Correspondance avec les e-compétences

De Frnexus.

<thead> </thead>

Activities

12207:2008 related processes

e-Competences

PM.1 Project Planning

6.3.1 Project Planning

A.4. Product or Project Planning

PM.2 Project Plan Execution

6.4.8 SW Acceptance Support, 7.2.2 SW Configuration Management,

7.2.3 SW Quality Assurance,

7.2.6 Review,

7.2.8 Problem Resolution

A.4. Product or Project Planning,

B.2. Systems Integration,

C.4. Problem Management,

E.6. ICT Quality Management

PM.3Project Assessment and Control

6.3.2 Project Assessment and Control,

6.3.7 Measurement

A.4. Product or Project Planning,

E.5. Process Improvement

PM.4 Project Closure

6.1.2 Supply

A.4. Product or Project Planning,

D.8. Contract Management

 

 

 

SI.1 SW Implementa-tion Initiation

6.3.1 Project Planning

A.4. Product or Project Planning

SI.2 SW RequirementAnalysis

6.4.1 Stakeholder Requirements Definition, 7.1.2 SW Requirements Analysis, 7.2.6 SW Review

A.6. Application Design

SI.3 SW Architectural and Detailed Design

7.1.3 SW Architectural Design, 7.1.4 SW Detailed Design, 7.1.5 SW Construction, 7.1.6 SW Integration, 7.1.7 SW Qualification Testing

B.1. Design and Development

SI.4 SW Construction

7.1.5 SW Construction

B.1. Design and Development

SI.5 SW Integration and Tests

7.1.5 SW Construction, 7.1.6 SW Integration, 7.1.7 SW Qualification Testing, 7.2.1 Documentation, 7.2.4 SW Verification, and 7.2.5 Validation

B.1. Design and Development

B.3. Testing

B.5. Documen-tation Production

SI.6 Product Delivery

6.1.2 Supply

B.4. Solution Deployment