Title : Implementation Process
Process group : Technical Processes
Lower-level process of : none
Replaced by process : 7.1.1
Specialization of : none
Conforming instance of : Implementation Process of ISO/IEC 15288

Purpose : The purpose of the Implementation Process is to realize a specified system element.

Activities :


List of outcomes : As a result of successful implementation of the System Integration Process:
a) a strategy is developed to integrate the system according to the priorities of the system requirements;
b) criteria are developed to verify compliance with the system requirements allocated to the system elements, including the interfaces between system elements;
c) the system integration is verified using the defined criteria;
d) a regression strategy is developed and applied for re-testing the system when changes are made;
e) consistency and traceability are established between the system design and the integrated system elements;
f) an integrated system is constructed that demonstrates compliance with the system design; and
g) an integrated system is constructed that demonstrates that a complete set of usable deliverable system elements exists.

NOTE Users of this International Standard have the intention of treating a software product or a software element of a larger system. The Software Implementation Process (subclause 7.1.1) is a conforming instance of the Implementation Process of ISO/IEC 15288, specialized to the particular needs of implementing a software product or service. The Software Implementation Process replaces the Implementation Process in this International Standard.

Faits relatifs à 6.4.4 — Recherche de pages similaires avec +.Voir comme RDF
Id6.4.4  +
IsConformingInstanceOfImplementation Process of ISO/IEC 15288  +
IsLowerLevelProcessOfNone  +
IsPartOfTechnical Processes  +
IsReplacedBy7.1.1  +
IsSpecializationOfnone  +
OutcomeAs a result of successful implementation of the System Integration Process:  +, a) a strategy is developed to integrate the system according to the priorities of the system requirements;  +, b) criteria are developed to verify compliance with the system requirements allocated to the system elements, including the interfaces between system elements;  +, c) the system integration is verified using the defined criteria;  +, d) a regression strategy is developed and applied for re-testing the system when changes are made;  +, e) consistency and traceability are established between the system design and the integrated system elements;  +, f) an integrated system is constructed that demonstrates compliance with the system design; and  + et g) an integrated system is constructed that demonstrates that a complete set of usable deliverable system elements exists.  +
TitleImplementation Process  +
Outils personnels